DATE |
MILESTONE |
June, 1965 |
Soviet Government Resolution about Mogilev Synthetic Fibre Plant construction. |
September, 1965 |
Commencement of Mogilev Synthetic Fibre Plant construction. |
5 November, 1968 |
Manufacture of the fibre “Lavsan” (at a pilot plant) – the first polyester fibre produced in the USSR. This fibre name includes the initial letters of the Russian name of the organization which was the first developer of the Soviet polyester fibre: the laboratory of high-molecular compounds of the Academy of Sciences of the USSR.
|
| 6 November, 1968 |
Startup of the pilot plant and other 15 production objects of the Synthetic Fibre Plant. |
31 December, 1969 |
Startup of the first DMT line at commercial load. |
21 April, 1970 |
Manufacture of the first polymer at the Polymerization Plant. |
At the same time a great number of community facilities were under construction: new dwelling houses, infant schools, secondary schools, educational buildings of Mogilev Technological Institute, now the Belarusian State Foodstuffs University, the chemical-engineering technical college, sports and cultural centres, pioneer camps, etc.
|
28 December, 1970 |
Production of the first lot of cord at the Cord and Silk Plant. |
29 December, 1971 |
Completion of the construction of the Synthetic Fibre Plant start up complex with a capacity of 50 000 t/y. |
19 April, 1973 |
Mogilev Synthetic Fibre Plant was named after V.I. Lenin. |
April, 1975 |
Startup of the Spare Parts Plant. |
25 October, 1976 |
Production of a millionth tonne of the synthetic fibre and yarn. |
6 June, 1977 |
Production of the first tonne of fibre at No.3 Synthetic Fibre Plant. |
March, 1982 |
Establishment of the Organic Synthesis Factory (on the basis of the DMT plants). |
31 December, 1983 |
Manufacture of the first polyethylene terephthalate at the Organic Synthesis Factory. |
November, 1989 |
Establishment of the Polyester Yarn Factory on the basis of No.2 Synthetic Complex Yarn Plant. |
August, 1994 |
Establishment of the Machinery and Repair Factory on the basis of the Spare Parts Plant and maintenance shops. |
1 September, 1997 |
Establishment of the Synthetic Fibre Factory on the basis of the three Synthetic Fibre Plants. |
14 July, 1998 |
Turnout of a millionth tonne of PET. |
23 January, 2001 |
The Quality System was certified as conforming to the International Standard ISO 9001 |
10 December, 2001 |
Presentation of the Certificate of Honour of the Standardization, Metrology and Certification Committee under the Council of Ministers of the Republic of Belarus for a high quality of the output goods. |
14 December, 2001 |
RUE “«ÌPA “Khimvolokno” became the winner of the competition «Best Goods of the Republic of Belarus at the Russian Federation Markets” 2001 |
7 February, 2003 |
Establishment of ÎÀÎ «Ìîgilevkhimvolokno”. |
July, 2004 |
Startup of the Composite Material Plant. |
2 December, 2004 |
Issue of the Ecological Certificate certifying that the environmental management system conforms to the STB ISO 14001-2000. |
17 January, 2005 |
Establishment of the Nonwoven Material Plant. |
16 December, 2005 |
Manufacture of the first polyester fabric for roofing materials. |
8 June, 2006 |
Issue of the Certificate of the Quality Management System Conformity to ISO 9001:2000. |
July, 2006 |
Mastering of high-modulus high-tenacity industrial yarn production (at the Polyester Yarn Factory). |
September, 2006 |
Organization of the Construction and Repair Division. |
October, 2006 |
Mastering of the bicomponent fibre production (at the Synthetic Fibre Factory). |
August, 2007 |
Startup of the Strapping Band Plant. |
September, 2007 |
Startup of the Polyester Material Plant. |
31 December, 2007 |
Startup of the Pressure Fire Hose Plant. |
30 August, 2008 |
Startup of the first power generating unit of the Energy Technological Complex. |
30 September, 2008 |
Manufacture of HT (high-tenacity) and LS (low - shrinkage) industrial yarns at the Polyester Yarn Factory. |
4 November, 2008 |
Startup of the Continuous Polycondensation Plant with a capacity of 80 000 t/y. |
December, 20008 |
Implementation of the Integrated Management System: - Quality Management System (ISO 9001: 2000); - Environmental Management System (ISO 14001: 2004); - Occupational Health and Safety Management System (OHSAS 18001: 2007). |
1 February, 2009 |
Startup of the Biodiesel Fuel Line with a capacity of 300 000 t/y. |
March, 2009 |
The Polyester Material Plant became a part of the Synthetic Fibre Factory. |
June, 2009 | Launching PTA - based CO-PET (bottle grade) production (at the Continuous Polycondensation Plant with a capacity of 80 000 t/y). |
July, 2009 | Modernization of continuous polycondensation plant with production capacity 80 thous. t/year regarding its change-over to production of bottle grade PET is complete |
January, 2010 | OAO “Mogilevkhimvolokno” became the winner of the prize of the Government of the Republic of Belarus in the field of quality. |
February, 2010 | For high performances OAO “Mogilevkhimvolokno” was chosen as the winner of city competition between industrial enterprises and awarded a challenge banner of honor of Mogilev executive committee. |
March, 2010 | Production of low flammability fiber, low flammability polymer and peeling resistant fiber was developed at Synthetic Fiber Factory. |
March, 2010 | Production of new assortment of PET preforms (1 and 1,5 l) was developed at Organic Synthesis Factory. |
April, 2010 | Completion of modernization of PET production equipment at chemical shop, Organic Synthesis Factory. |
November, 2010 | Start-up of the line for needle-punched nonwoven material production with a capacity of 5000 tons per year at the Synthetic Fiber Factory. New department has been formed-Polyester web production department. |
February, 2011 | OAO "Mogilevkhimvolokno" became a winner in the city competition among industrial enterprises for good results of work in 2010 and was awarded an Honorary Challenge Banner of the Mogilev Municipal Executive Committee. |
March, 2011 | OAO "Mogilevkhimvolokno" was awarded a governmental prize for achievements in the field of quality improvement in 2010. |
June, 2011 | Start-up of the complete process line for PET wastes recycling at Synthetic Fiber Factory. |
September, 2011 | Investment project "Doubling and twisting section revamping" was implemented at Polyester Yarn Factory. |